Following a number
of disruptive blockages to the sewer system at a number
of juvenile centres resulting from foreign items entering
the system, Thorburn was engaged to manage the development,
design and installation of an arrestor system to minimise
such blockages.
An innovative solution comprising a series
of pits and collection devices was developed by the hydraulics
engineers following which the system was successfully
rolled out to number of centres throughout NSW. |